Power Infrastructure

The homelab runs on battery-backed power to survive grid outages. Since the home-office rewiring of 2026-09-21 the battery station and the UPS are two tiers, not one chain: only the two servers and their switch get the UPS.

Power Chain

AC Grid (120V) → Anker SOLIX F2000 ─┬─→ CyberPower CP1000PFCLCD → indri, ringtail, ethernet switch
                                    └─→ everything else (sifaka, UX7, Starlink, desk, peripherals)
StageDeviceNotes
Grid120V AC mainsCharges the battery station
BatteryAnker SOLIX F2000 GaNPrime2048Wh portable power station; everything in the office runs through it
UPSCyberPower CP1000PFCLCD1000VA / 600W, pure sine wave output, fast transfer; servers only

Devices on UPS

DeviceRole
indriPrimary server
ringtailGPU compute / gaming PC
Ethernet switchThe UniFi Flex Mini the servers hang off (unifi)

Devices on the battery station only

DeviceRoleOutage behaviour
sifakaNASSurvives on battery; may see the station’s transfer blip
UniFi Express 7WiFi routerSame; expect a brief network drop during a grid outage
StarlinkSatellite internet uplinkSame
Standing desk, monitors, chargersOfficeSame

Why the split

Before the rewiring every device sat behind the UPS, which was oversubscribed: transient loads such as raising the standing desk (its motors are the largest single draw in the office) while ringtail was under heavy load pushed the UPS past 600W and it alarmed. Moving everything but the servers and their switch onto the battery station keeps the UPS’s headroom and its pure-sine, fast-transfer output for the two hosts that cannot tolerate a power blip.

The cost is that the router and Starlink now ride the battery station’s slower transfer, so a grid outage can still drop the network briefly even though the servers stay up. There is no wire routing today that avoids this; a second, larger UPS would.